Project information

Project Information

The Desk study studied possible hydro power project capacity ranging from 5MW-8.85MW in the river stretch between Khar Khola and Phedi Bazar of Gorkha district near up stream of Daraundi Nadi Dobhan of Majhuwa Deurali village, and identified one site as an optimum to develop a hydro power project of capacity of 8.85MW. This study area lies between 0.50 Km upstream from Daraudi Nadi Dobhan and Khar Khola Dobhan. The Proposed powerhouse lies just 0.80-0.90 Km upstream from Daraudi Nadi Dobhan and intake will be 4.50 km upstream from proposed power house just opposite of Adhaigau of Khar Khola Dobhan of Gorkha district of Duwakot village at right bank.

Studies so far done